xpornplease pornjk pornsam pornpk foxporn joyporn porncuze ionporn.tv porn100.tv sevenpornz porn800

Portfolio

Install drainage systems in three different Seattle locations.
2025, Seattle

SPU Drainage Systems

Storm, 12 months
Parking lot surface and utility improvements.
2025, Port of Seattle

North Employee Parking Lot Phase 3

Water & Storm, 18 months
Install EV Chargers around Microsoft campus.
2025, Microsoft

EV Chargers

Roadwork & Electrical, 6 months
Install new gravity sewer on piles on private property through wetland.
2025, Bellevue

Bogline Sewer Rehabilitation

Sewer, 6 months
Install new watermain and storm improvements on NE 92nd St.
2024, Seattle

NE 92nd Utility Improvements

Water & Storm, 6 months
Repair a 22 ft deep sewer in the heart of downtown Seattle under emergency bypass.
2024, Seattle

4th & Virginia Sewer Emergency

Sewer, 6 months
Install new water main, cathodic protection, repave roads and restore sidewalks at seven sites.
2024, Seattle

Water Main Rehab #5

Water, 2 years
Install drainage and remove contaminated soil. Repair roadway, railroad.
2024, Port of Seattle

Terminal 5 Intermodal Yard Improvements

Roadwork, 6 months
7.5 miles of new bike lanes, new sidewalk and improved signaling.
2023, Edmonds

Bike and Walkway Improvements

Roadwork, 8 months
Install lighting, EV charging, utilities and permanent restrooms to support taxi operations.
2023, Port of Seattle

160th TNC Lot Upgrades

Earthwork, 12 months
Perform Urgent Sewer Repairs for SPU.
2023, Seattle

Spot Sewer Repair #5

Sewer, 2 years
Installing 1,470 lf 12" HDPE sewer main, 1,400 LF of CIPP and roadwork.
2023, City of Renton

Thunder Hills Sewer Interceptor Rehabilitation

Sewer, 6 months
Retrofit lift station structure with pumps, valve and meter vault, sewer piping, and electrical.
2023, SW Suburban Sewer District

Lift Station 18 Phase 2

Sewer, 8 months
Construct new retaining wall with permanent shoring, fencing, parking lot.
2023, Seattle Housing Authority

West Seattle Facility Site Work

Earthwork, 6 months
Construct bicycle, pedestrian, and traffic signal improvements.
2023, Seattle

NE 117th Intersection Redesign

Road Improvements, 7 months
Install a soldier pile wall, utilities, restore landscape and roadway.
2023, Bellevue

98th Ave Slope Stabilization

Earthwork, 8 months
Small strategic upgrades 6 different locations, including utilities, concrete and electrical.
2023, Issaquah

Small Strategic Projects

Roadwork, 8 months
Install 1000 LF of conduit on 236th St, including crossing I-5.
2022, Snohomish PUD

236th St Conduit Installation

Conduit, 6 months
Emergency sewer repair in SoDo.
2022, King County

Emergency Sewer Repair

Sewer, 1 week
Install 3500 LF of 12” Water Main.
2022, Covington Water District

148th Watermain Extension

Water, 6 months
Install 1000 LF of 16” Sewer Force Main.
2022, Sammamish Plateau Water

Interim Central Lake Forcemain

Sewer, 8 months
Install over 8000 LF of water Main.
2022, KC Water District 20

1st Ave S Water Main Replacement - Phase 2

Water, 6 months
Repair 10 LF of sewer pipe at 26' deep, navigating utility conflicts.
2022, Seattle

Broadmoor Emergency Sewer Repair

Sewer, 6 months
Install 1900 LF of bored Sewer Force Main.
2022, SW Suburban Sewer District

Lift Station 18 Upgrades

Sewer, 7 months
Install 4,500 LF of water main, install a retaining wall and sidewalk.
2022, Tukwila

Water Main Replacement and Sidewalk Installation

Water, 5 months
Urgent repair installing a 42 inch metal sewer pipe with dual active bypass as part of a $3M King County work order.
2021, Seattle

Duwamish Interceptor Urgent Sewer Repair

Sewer, 7 month
Emergency response, fixed a complicated leak in one day thanks to our specialized crew and equipment.
2021, Seattle

SW Suburban Sewer District Emergency Repair

Sewer, 1 day
Install new water main, repave roads and restore sidewalks at six sites.
2020, Seattle

Water Main Rehab Package

Water, 2 years
Install over 12,000 LF of water Main.
2020, KC Water District 20

1st Ave S Water Main Replacement - Phase 1

Water, 2 years
Install over 13,000 LF of water main and sanitary sewer; Complete re-pavement of the neighborhood.
2019, Renton

Renton Hill Utility Replacement

Water/Sewer/Storm, 18 months